Customization: | Available |
---|---|
Type: | Jar |
Material: | Porcelain |
Still deciding? Get samples of US$ 70/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Name | Antique White Straight cylinder ceramic Storage Container tea pot Porcelain Flat Lidded Jar |
Item NO. | RZPI06-A/RZPI06-B/RZPI06-C |
Color | white |
Size | Product SKU:RZPI06-A Size (cm):28H x18.5W Size (inches):11H x 7.3W Product SKU:RZPI06-B Size (cm):39.5H x23.3W Size (inches):15.6H x 9.2W Product SKU:RZPI06-C Size (cm):49H x25W Size (inches):19.3H x 9.8W |
Material | Ceramic,porcelain |
Package | Polyfoam + inner box + cartons |
Origin | Jingdezhen, Jiangxi Province, China |
Payment term | T/T, Paypal, Western Union, L/C at sight. 30% Deposit, 70% balance before shipment |
1:Why choose us?
A:Direct factory
We are a trading company with our factory,we can provide good quality,good service without too much extra cost,always give the most competitive price.Also,contacting with a direct factory is more convenient for quality and lead time contral.
B:Professional in Customized order
We are specialized in household ceramic industry for over 16 years,producing thousand of customized ceramics.Our flexible production lines could satisfy your specific need.
2.Delivery
(1):We support EXW/DDP/DDU/FOB/CIF and other trade terms.Ningbo and Jiujiang port are close to us.
(2):Once deposit received,mass production will be arranged at once.
(3):Production time calculated from receipt of deposit .
(4):Delivery time base on shipping arrangement.
(5):Roughly production time for 20 feet container is 35 days and 40 feet container 45 days.Specific production lead time could be required due to our flexible production lines.